Close Menu
  • Home
  • Politics
  • Entertainment
  • News
  • Interviews
  • Events
  • Fashion
  • Article
  • Lifestyle
  • Movies & TV
  • Music
What's Hot

Twin Sisters, Doctor and Pharmacist, Die Days Apart After Sickle Cell Battle in Yobe

Senator Ndubueze inaugurates Divine Project 2027, charges directors to take development record to Imo north grassroots

Military aircraft crash in Ondo: All 32 passengers and crew members killed

Facebook X (Twitter) Instagram
  • Home
  • Politics
  • Entertainment
  • News
  • Interviews
  • Events
  • Fashion
  • Article
  • Lifestyle
  • Movies & TV
  • Music
Facebook X (Twitter) Instagram Pinterest
DAILY BLAST
Contact
HOT TOPICS
  • Home
  • Politics
  • Entertainment
  • News
  • Interviews
  • Events
  • Fashion
  • Article
  • Lifestyle
  • Movies & TV
  • Music
DAILY BLAST
You are at:Home»Breaking News»Transmission Company announces blackout in parts of Abuja over maintenance
Breaking News

Transmission Company announces blackout in parts of Abuja over maintenance

DailyblastBy DailyblastDecember 4, 202301 Min Read
Share WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Share
Facebook Twitter LinkedIn Pinterest Email WhatsApp Copy Link

The Transmission Company of Nigeria TCN has announced that there will be some hours of lack of power supply in some parts of the Federal Capital Territory, Abuja.

TCN said the areas would be without power supply for hours on Monday following planned maintenance in its Kubwa substation.

Related posts:

  1. Blackout in Abuja as TCN carries out maintenance on transmission substations
  2. Transmission Company of Nigeria announces seven-hour power interruption in Abuja
  3. Electricity: Parts of Abuja experience blackout – AEDC
  4. Buhari Sacks Managing Director of Transmission Company of Nigeria

The areas were identified as Kubwa, Bwari and its environs.

This was contained in a statement signed by the General Manager of Public Affairs, TCN, on Sunday night, noting that the maintenance of its three 33kV feeders in Kubwa Substation is expected to commence from 10:00 am Monday through 5 pm.

The statement reads in part; “The Transmission Company of Nigeria (TCN) wishes to announce that its crew will perform scheduled maintenance on three 33kV feeders in Kubwa Substation. Maintenance will commence on Monday, 4 December, 2023, from 10.00 am to 5:00 pm.

“Consequently, there will be power interruption on the feeders mentioned, affecting power supply through AEDC to its customers within Kubwa, Bwari and environs for seven hours tomorrow.

“Power supply will be restored to the affected areas as soon as maintenance is completed,” the statement added.

Post Views: 446
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram WhatsApp Copy Link
Previous ArticleNews Central announces Kayode Akintemi as Managing Director/Editor-in -Chief
Next Article ASUU rejects student loans, says Nigerians deserves grants
Dailyblast

Related Posts

Senator Ndubueze inaugurates Divine Project 2027, charges directors to take development record to Imo north grassroots

October 6, 2026

Military aircraft crash in Ondo: All 32 passengers and crew members killed

October 6, 2026

Don’t us for fake food products, most Nigerians are illiterates – NAFDAC boss, Prof Mojisola Adeyeye

October 6, 2026
Add A Comment

Comments are closed.

Recent Posts
  • Twin Sisters, Doctor and Pharmacist, Die Days Apart After Sickle Cell Battle in Yobe October 6, 2026
  • Senator Ndubueze inaugurates Divine Project 2027, charges directors to take development record to Imo north grassroots October 6, 2026
  • Military aircraft crash in Ondo: All 32 passengers and crew members killed October 6, 2026
  • Don’t us for fake food products, most Nigerians are illiterates – NAFDAC boss, Prof Mojisola Adeyeye October 6, 2026
  • SIXT-MEDIA LANE announces Annual Awards & National Leadership Lecture 2026 October 6, 2026
Top Posts

FCMB issue fake dollars to customer in Abuja

August 3, 2021

June 12 book: Ubani settles Dr Uzor Ngoladi & Chief Abimbola Aboderin matter out of court

August 4, 2021

Apostle Suleman slept with me twice and paid me N500,000 – Nollywood actress, Ifemeludike

August 21, 2021
Latest Reviews
Most Popular

FCMB issue fake dollars to customer in Abuja

August 3, 2021

June 12 book: Ubani settles Dr Uzor Ngoladi & Chief Abimbola Aboderin matter out of court

August 4, 2021

Apostle Suleman slept with me twice and paid me N500,000 – Nollywood actress, Ifemeludike

August 21, 2021
Our Picks

Twin Sisters, Doctor and Pharmacist, Die Days Apart After Sickle Cell Battle in Yobe

Senator Ndubueze inaugurates Divine Project 2027, charges directors to take development record to Imo north grassroots

Military aircraft crash in Ondo: All 32 passengers and crew members killed

© 2026
  • Privacy Policy
  • Contact

Type above and press Enter to search. Press Esc to cancel.