NDDC lists contracts allegedly paid for ‘under duress’ to get budget approval

Prof Pondei

Prof. Kemebradikumo Daniel Pondei, the Acting Managing Director of the Niger Delta Development Commission (NDDC) has listed some contracts the commission allegedly paid for under duress before its 2019 annual budget was approved. 

Pondei who alleged that some lawmakers, especially members of adhoc Committees have held the Commission hostage over the years with the annual budget approval, also disclosed that they were arm-twisted to pay for some contracts that “were never done or sometimes, never completed.”

In a statement released by his Special Adviser on Media, Edgar Ebigoni, the contracts and benefitting firms were listed as follows; 

Kith Global Ventures Ltd; Remedial Works at New Ogorode Roads Lot 3, at the cost of N493,684,169.00 and paid on the 17/03/2020, 301 Constr. Ltd; Remedial Works at Nja Road to Akoku Uno Lot 1, at the cost of N350,027,919.80 and paid on the 17/03/2020. Cracked Stone Constr. Ltd; Remedial Works at Ajaolubeti Road Environs Lot 2 at the cost of N394,010,952.10 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Township Road Lot 7, at the cost of N 431,053.035.20 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Township Road Lot 3, at the cost of N361,357,276.20 and paid on the 17/03/2020 and Grapik Ltd; Emergency at Umudee Internal Road, at the cost of N207,673,107.70 and paid the 17/03/2020.

Others were, Southland Constr. Ltd; Remedial Works at Umuduru Chukwu Umuorlu Road, at the cost of N518,409,089.30 and paid on paid on the17/03/2020. Southland Constr. Ltd; Remedial Works at Umuduru, at the cost of N519,949,949.10 and paid on the 17/03/2020.

Grandfox Global Services Ltd; Emergency at Ope Road Okigwe LGA, at the cost of N580,438,578.00 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Town Road Lot 6, at the cost of N348,853,184.60 and paid on the 7/03/2020 and Crism Constr. Building Ltd; Emergency at Eziama Osuama International Roads Isiala Mbano LGA, at the cost of N561,592,377.80 and paid on the17/03/2020.

Also paid were, Argento Ltd; Emergency at Benin Township Road Lot 4, at the cost of N382,805,411.60 and paid on the 18/03/2020. Two Rocks Cont. Ltd; Remedial Works at New Ogorode Road Lot 4, N500,875,848.00 and paid on the 18/03/2020. Elkan Zibson Ltd; Emergency Repairs of failed and unmotorable sections of Ezumoha Internal Roads Isiala Mbano LGA, at the cost of N531,150,414.29 and paid on the 19/03/2020. Cracked Stone Constr. Ltd; Remedial works on Failed and Unmotorable sections of Benin Township Road Lot 8, at the cost of N417,806,787.01 and paid on the 19/03/2020. PDH Global Logistics Ltd; Emergency Repairs of Failed and Unmotorable sections of Umuezuo Umuagbavu Road Remedy Failed and unmotorable sections of Chikwe Orlu Street Environment, at the cost of N543,247,587.35 and paid on the 20/03/2020. Aritel Oil and Gas; Remedy Failed and Motorable sections of Chikwe Orlu Street Environment, at the cost of N550,100,132.34 and paid on the 24/03/202.

Dis Concept and Solutions Ltd; Urgently Remedy Failed and Un motorable sections of Jessy and Jenny Road off peter Odily Road PHC, at the cost of N476,794,367.22 and paid on the 26/03/2020. Ogugo Concept and Solutions Ltd; Emergency Repairs of Failed and Unmotorable sections of Environs Yenagoa LGA, at the cost of N300,029,695.14 and paid on the 26/03/2020. Webster Global ventures Ltd; Instruction of emergency Repairs of failed and unmotorable sections Benin Township Road Lot 2 Oredo LGA, at the cost of N357,242,054.35 and paid on the 26/03/2020. Webster Global ventures Ltd; Remedial Works of Failed and unmotorable sections of Akuku Illah Road Oshimili North LGA, at the cost of N 463,489,890.13 and paid on the 26/03/2020 and Webster Global ventures Ltd; Remedial Works of failed and Unmotorable sections of New Ogorode Road Lot2 Sapele LGA, at the cost of N 466,416,380.71 and paid on the 26/03/2020.

Related Posts